Section 12A-92 As built drawings.


    As built construction drawings that show the final design specifications and are certified by a professional engineer are required on all permanent stormwater management facilities.  The as built drawings must be submitted before city approval or acceptance of the facilities.

(Ord. No. 13019, § 1, 7-1-91; Ord. No. 19442, § 2, 3-5-07)


(Ord. 19442, Repealed and Replaced, 03/05/2007, Prior Text)