Section 24-41 Required.
Prior to the adoption of Ord. 20654 on 06/21/2010, Section 24-41 read as follows.
(a)
No person shall construct, reconstruct, repair, alter or grade any sidewalk, curb, curb cut,
driveway or street on the public streets or rights-of-way without first obtaining a permit from the
director of public works.
(b) No person shall close a public sidewalk in connection
with a construction project without
first obtaining a permit either under this division,
if the sidewalk is to be closed for thirty (30)
days or less. If the sidewalk is to be closed for more than thirty (30) days, Article IV
should be followed.
(Code 1964, § 14.220)