Section 101-121 Res. 36-00; Setting a Public Hearing RE: Construction of an 8-inch Water Main Located in and Serving Quail Creek, Plat 1 Subdivision


Council Bill No.          R 36-00          

A RESOLUTION

declaring the necessity for the construction of an 8inch water main located in and serving Quail Creek, Plat 1; stating the nature of the improvement; estimating the extra cost for constructing an 8-inch rather than a 6-inch water main; providing that the improvement shall be made by Greenwing Development, L.L.C.; providing that payment for the extra cost of constructing a larger water main shall be from the Capital/Transmission and Distribution Mains account; and setting a public hearing.

    WHEREAS, Greenwing Development, L.L.C. desires to install a 6-inch water main to serve property abutting the proposed water main extension; and

    WHEREAS, the City for reasons of health, safety, public welfare, and future adequate service to areas other than Quail Creek, Plat 1, requires that an 8inch water main be installed; and

    WHEREAS, plans and specifications for such installation have been prepared by the Director of the Water and Light Department.

    NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA, MISSOURI, AS FOLLOWS:

    SECTION 1.  The Council deems the construction of about 1525 feet of 8inch water main pipes and accessory valves and fittings located in and serving Quail Creek, Plat 1, necessary to assure adequate future water supply for the health, safety and welfare of the citizens of the City.

    SECTION 2.  The nature and scope of the improvement shall consist of furnishing all labor, materials, transportation, insurance and all other items necessary for the complete construction of the water main described in Section 1.

    SECTION 3.  The estimated differential cost (the cost of constructing an 8-inch water main which exceeds the cost of constructing a 6-inch water main) of this improvement is $ 3.42 per linear foot.

    SECTION 4.  This improvement shall be made by Greenwing Development, L.L.C.

    SECTION 5.  Payment of differential costs, not to exceed the estimated amounts stated in Section 3, shall be made to Greenwing Development, L.L.C. from the Capital/Transmission and Distribution Mains Account upon satisfactory completion of the work and acceptance of the Engineer's Report by the City Council.

    SECTION 6.  This resolution shall be published in a daily newspaper of general circulation in the City of Columbia for seven (7) consecutive insertions, and a public hearing in respect to this improvement will be held in the Council Chamber of the Daniel Boone Building, 701 E. Broadway, Columbia, Missouri, at 7:00 p.m., on March 20, 2000.

    ADOPTED this   6th   day of   March  , 2000.