Section 103-235; Res. 83-02; Setting a Public Hearing RE: Construction of an 8" Water Main Serving West Lawn, Plat 1


Council Bill No.          R 83-02          

A RESOLUTION

declaring the necessity for the construction of an 8inch water main serving West Lawn, Plat 1; stating the nature of the improvement; estimating the extra cost for constructing an 8-inch rather than a 6-inch water main; providing that the improvement shall be made by F. Garland, Jr. and Peggy Lee C. Russell; providing that payment for the extra cost of constructing a larger water main shall be from water utility funds; and setting a public hearing.

    WHEREAS, F. Garland, Jr. and Peggy Lee C. Russell desire to install a 6inch water main to serve West Lawn, Plat 1; and

    WHEREAS, the City for reasons of health, safety, public welfare, and future adequate service to areas other than West Lawn, Plat 1, requires that an 8inch water main be installed; and

    WHEREAS, plans and specifications for such installation have been prepared by the Director of the Water and Light Department.

    NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA, MISSOURI, AS FOLLOWS:

    SECTION 1.  The Council deems the construction of approximately 2,100 feet of 8inch water main pipes, accessory valves and fittings and fire hydrants and appurtenances running along Hartfield Drive, Rothwell Drive and Leland Ridge Road necessary to assure adequate future water supply for the health, safety and welfare of the citizens of the City.

    SECTION 2.  The nature and scope of the improvement shall consist of furnishing all labor, materials, transportation, insurance and all other items necessary for the complete construction of the water main described in Section 1.

    SECTION 3.  The estimated differential cost (the cost of constructing an 8-inch water main which exceeds the cost of constructing a 6-inch water main) of this improvement is $ 4.06 per linear foot.

    SECTION 4.  This improvement shall be made by F. Garland, Jr. and Peggy Lee C. Russell.

    SECTION 5.  Payment of differential costs, not to exceed the estimated amounts stated in Section 3, shall be made to F. Garland, Jr. and Peggy Lee C. Russell from the Capital/Transmission and Distribution Mains Account upon satisfactory completion of the work and acceptance of the Engineer's Report by the City Council.

    SECTION 6.  This resolution shall be published in a daily newspaper of general circulation in the City of Columbia for seven (7) consecutive insertions, and a public hearing in respect to this improvement will be held in the Council Chamber of the Daniel Boone Building, 701 E. Broadway, Columbia, Missouri, at 7:00 p.m., on May 6, 2002.

    ADOPTED this 16th day of April, 2002.