Slideshow of photos taken during of the construction progress made the week of September 2-5, 2008.
Narratives from the slideshow
- 09-02-2008 Shingles are being layed and brickwork on the south side continue
- 09-05-2008 Masons have made progress on the south side and the glass block windows add detail
- 09-05-2008 Rain, rain, rain but a few more shingles in place
Follow Us: