Fire Facts
Roughly two out of every three child-playing fires -- and three out of four of associated deaths and injuries -- involve matches or lighters.
Source: From NFPA's Children Playing with Fire, March 2005.
Slideshow of photos taken during of the construction progress made the week of August 4-8, 2008.
Narratives from the slideshow
- 08-04-2008 Shower units are delivered for installation
- 08-04-2008 View of the front of Station 7
- 08-04-2008 View of the south (rear) wall of Station 7
- 08-05-2008 A solder course is added for decorative effect to the brick veneer
- 08-05-2008 Masons continue to enclose the steel columns in concrete block to accept the finish brick
- 08-05-2008 Steel workers weld a beam and roof supports in place on the south side of the building
- 08-05-2008 Workers add metal studs to the south apparatus bay wall
- 08-06-2008 Greenmeadows Way is cut and opened to run the watermain from the west side of the road to the east side
- 08-06-2008 Masons finish the brick veneer on the west and north side - decorative trim will be added above the brick
- 08-06-2008 Overhead view of Station 7
- 08-07-2008 View of the front (west side) of Station 7
- 08-08-2008 Front view of Station 7
- 08-08-2008 The mezzanine storage level is poured and finished with light weight concrete