Columbia Parks and Recreation
Creating Community through People, Parks and Programs
Browse GoColumbiaMo.com Skip top Navigation. Translate this page


Council Items: Click here.
|
|||||||||||||||||||||||||||
To determine where repairs were needed, the courts were flooded. |
|||||||||||||||||||||||||||
| Following a waiting period of one hour during mid-day temperatures of 80 degrees, areas where water depth remained deeper than the depth of a nickel were marked for repair. | |||||||||||||||||||||||||||
Concrete patch filler was used on low spots, while high spots or ridges were ground down. Tolerances were spot checked using string line. Concrete patches were applied in several thin stages with drying time between. |
|||||||||||||||||||||||||||
| Surface cracks were filled and peeling paint was removed. | |||||||||||||||||||||||||||
| Another flooding of the courts confirmed birdbaths had been repaired to USTA guidelines. | |||||||||||||||||||||||||||
| All surface area was covered with a base paint layer. | |||||||||||||||||||||||||||
| Color coats were then added defining playing areas. Lines were added last. | |||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||
Follow Us: