Public Works operates
and manages the
Engineering Division, Street
Division, Traffic Division and Public
Transportation; Columbia
Regional Airport; Sanitary
Sewer Utility; Parking Utility;
Solid Waste Utility; Storm
Water Utility; Custodial and
Building Maintenance
Services; and Fleet
Operations.
Sanitary Sewer
Standard Pump Station Details
Drawing
No.
Description
View Detail
(Adobe PDF Format
Download Detail (AutoCAD 2000i Format)
01
Force Main Installation
02
Horizontal Thrust Block
03
Vertical Thrust Block
04
Force Main Termination
05
Air Release Valve Vault
(Section View)
06
Air Release Valve Vault
(Plan View)
07
In-Line Cleanout
08
End-Of-Line Cleanout
09
Tracer Wire Access Vault
10
Submersible Lift Station
(Section View)
11
Submersible Lift Station
(Plan View)
12
Suction-Lift Lift Station
(Section View)
13
Suction-Lift Lift Station
(Plan View)
14
Pump Station Access
Driveway Cross Section
15
Access Driveway & Turn-around Area
16
Typical Pump Station Site Plan
17
Standard Line Post
18
Standard Corner
19
Standard Pull Post
20
Standard Gate
21
Barbed Wire
22
Fastening and Tying
23
Sign
Click the button below to download all 23 Standard Details in DWG format (one file, 617KB, self-extracting).