Public Works
operates
and manages the
Engineering Division, Street
Division, Traffic Division and
Building and Site Development; Public
Transportation; Columbia
Regional Airport; Sanitary
Sewer Utility; Parking Utility;
Solid Waste Utility; Storm
Water Utility; Custodial and
Building Maintenance
Services; and Fleet
Operations.

Bike rider demonstrating the ease of loading bikes on Columbia Transit bus during
Bike, Walk & Wheel Week.
Bike-n-Bus Brochure (PDF)
|
- Easy to operate; instructions printed on the rack.
- Passenger/owners of bicycles must operate and load their bikes on the racks themselves.
- If necessary, driver will assist first-time users.
- Just slip the spring over the tire; 30-45 seconds to load/unload.
- When bike is removed from the rack, please return rack to upright position.
- First come, first served to the first open position on bike rack.
Remember, timely loading of passengers is important in keeping
the buses on schedule!
|